The Asian Development Bank is financing a consultancy for the Directorate General of Drug Administration, DGDA, to establish a new National Drug Control Laboratory and a training centre in Dhaka, built and equipped to WHO and international standards on a turnkey EPC basis. It runs in three stages, roughly four years in total.
-Stage one is about eight months, preparing the EPC bidding documents, the employer's requirements, the technical specifications and the cost estimates, and supporting DGDA through procurement to contract award.
-Stage two is about twenty-four months, supervising design, construction, equipment installation, commissioning and the start of operations.
-Stage three is about twelve months of defect-liability monitoring, training and closeout.
The responsibilities of the Architect will be the following for 4 person-months over the project's period of 44 months.
1) Assist TL in all architectural matters as per the requirement.
2) Assist TL in preparation of indicative layout and architecture designs for bidding purposes.
3) Review the architectural plans/designs/drawings/specifications etc submitted by EPC contractor and to assist DGDA in finalizing the architectural designs/drawings and layouts/ specifications etc.
4) Review the final master plot plan (2D and 3D versions in auto-cad and pdf formats) with all the necessary details submitted by EPC contractor and assist DGDA in according to necessary approvals. |